Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. DakotaKid01

    Flowable Fill (CDF) Under Retaining Wall Foundation

    I am designing a spread footing retaining wall to replace a pile supported retaining wall. The wall is adjacent to the abutment wall of road underpass for a railroad bridge. The road is being realigned so they are removing the pile supported wall and putting a spread footing one in the same...
  2. DakotaKid01

    Concrete Joint between New Retaining Wall and Existing Bridge Abutment

    I am working on the design of a concrete joint between an existing bridge abutment and a new retaining wall. The existing bridge (built in 1964) carries a railroad over a roadway underpass and has a wingwall that extends to become a retaining wall approximately 275 feet long. The roadway is...

Part and Inventory Search

Back
Top