Hello, I checked a girth flange of a heat exchanger in accordance with ASME VIII div1 appendix 2, as per project specification and everything is verified, but if I check the flange with ASME PCC-1 appendix O as well, the verification isn’t ok.
Bolts are not enough to seat the gasket.
In this...