What equipment or tool is rcommended or how does one identify which phase attribute a specific area in the building is on when the circuit is deep inside a commercial complex and without taking an outage.
How would someone calculate what the savings in generation costs would be to a utility if the load imbalance on a distribution system was corrected. The thought is this will correct the low power factor to some extent.