Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations Ron247 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Boiler106
  • Content: Threads
  • Order by date
  1. Boiler106

    Minimum Aggregate Size for Slab on Grade

    We have an 8 inch slab with rolling equipment and enhanced aggregate interlock utilizing reinforcing crossing the control joints. i received a mix design that utilizes #78 pea gravel. my gut tells me to reject this for the aggregate interlock issue the pea gravel will likely create, given that...
  2. Boiler106

    Augercast Pile Minimum Diameter for stability

    Structural engineer here. Using IBC 2015 in the southeast USA, seismic design category, can someone please clarify the "the height does not exceed 12 times the least horizontal dimension" exception in 1810.10.2.2? Specifically, i am looking to find the smallest diameter auger cast pile that can...
  3. Boiler106

    Seal Welds and Intermittent Welds

    I am reinforcing a column in a corrosive environment using AISC. The column is a PEMB built-up column with 3/8" flanges that i am welding an HSS member to along its length. I would like to limit distortion of the flanges using an intermittent flare bevel weld and then follow up with a seal weld...
  4. Boiler106

    Basic Structural System - equipment pad

    this is a dumb question, for sure, but does anyone know how i might describe the basic structural system on my design criteria section for a project that just consists of an equipment pad in a high seismic zone? Should i list it as "N/A, Ground Supported Slab"?
  5. Boiler106

    Effective Wind Area - Stud Wall with Parapet

    I have a stud wall that bypasses the roof line to form a parapet. Ive been using an effective wind area for the wall based on the overall length 21.1' to get 21.1'2/3 and use this value to get both my wind loads for the wall portion and the parapet portion. Im second guessing myself and...
  6. Boiler106

    Vibration Mitigation

    I've been tasked with creating design drawings from a vibration mitigation study performed by a specialty engineer on a composite framed steel floor with slab on metal deck for sensitive equipment. The specialty engineer used finite element modelling to determine the repairs which consist of...
  7. Boiler106

    How do California structural PE's refer to themselves on company resumes/RFP's?

    Can you use the term "structural" but not "structural engineer" in your title on company resumes? Would it be Mr. Boiler106, PE (structural)?
  8. Boiler106

    Post for Vibration Mitigation

    i have a post to place under a beam to mitigate vibration issues supporting sensitive equipment. I understand from AISC DG11 that this column will need to be jacked into place Does anyone have experience with doing this, either in modelling or construction? I'm trying to decide how much...
  9. Boiler106

    Slab on metal deck over masonry

    we rarely get this condition, but i frequently see on other's drawings the slab on metal deck placed over load bearing walls with no positive connection to the wall prior to placing the slab. the attachment is sometimes made with a dowel from the masonry wall to the slab, otherwise, the deck is...
  10. Boiler106

    Clearance to tighten bolt at concrete wall

    Does anyone have a rule of thumb for clearance required between a wall and beam flange tip for a worker to reach down and put a spud wrench on the back of a bolt? I'm thinking 6 inches minimum.
  11. Boiler106

    ASRS on superflat structural slab

    Hi all, i have an 85 ft tall asrs setting on a 24 inch thick slab which will be supported by a matrix of auger cast piles. Pile spacing is yet to be determined. the slab will be set on grade and not on void forms, but fully supported by piles. Does anyone have any experience in dealing with...
  12. Boiler106

    Cornice Live Load

    IBC 2015: Cornice - A projecting horizontal molded element located at or near the top of an architectural feature Anyone have an opinion on live load for a roof level eyebrow/overhang framed with cantilevered steel and cold formed infill framing that projects say 5ft? It's certainly not...
  13. Boiler106

    Tilt Panel Slab Tie Back Capacity

    Eastern US: we're seeing tilt panels from many different engineers being restrained with a 15' long pour back strip that is reinforced and tied into an 15' long unreinforced slab on grade panel with a deformed dowel, say 48 inches long, to seemingly utilize the friction force from that slab...
  14. Boiler106

    Intermediate Precast Shear Walls for Tilt

    Using IBC 2015, ACI 318-14, it appears to me that there are no wall pier requirements for intermediate precast shear walls in SDC C (but there are requirements in D, E and F). We have seen drawings from other firms that use intermediate walls for SDC B and C buildings and show wall pier closed...
  15. Boiler106

    Roof Framing 3 inch Deck, Beams at 10ft spacing

    I'm curious if anyone uses this framing system in the US where beams are spaced at 10ft oc with 3N metal roof deck and how it affects utility supports. I have two applications for this system and im concerned that it will become a problem once MEP starts going in and they are used to having...
  16. Boiler106

    Boomerang-shaped buildings

    For a boomerang shaped building, does anyone see an alternative to braced frames and double column lines at a and b in the sketch below? Building is located in the southeast, low seismic. Single story, tilt panels, bar joist and metal deck roof. i feel like sliding expansion joints would bind...
  17. Boiler106

    Reinforcing Equipment Foundation Exposed to View

    We have a 16 in thick x 40ft x 30ft equipment foundation in the interior of a plant. We are currently using #7@12" based on analysis. For a mat this long, is it typical to provide 0.5% reinforcing in the top mat? We currently have enough to provide >0.5% reinforcing if we included the bottom...
  18. Boiler106

    Crane walking on Tilt Panel

    we've been asked if walking a 640k crane over a tilt panel is acceptable due to site constraints. i have no intention of answering this question in the affirmative as its means and methods but i wondered if anyone has come across this before. i understand the mechanics of the situation but it...
  19. Boiler106

    Retaining Wall Construction Joint Spacing

    we've carried a 60ft maximum spacing for construction joints for concrete retaining walls for decades but we don't know where this originated. We've noted that many other firms carry this same requirement and we often get pushback from contractors. from our research, we cant find anything...
  20. Boiler106

    ACI Enhanced Aggregate Interlock Force Transfer

    Im trying to determine if enhanced aggregate interlock is enough for force transfer of a hard wheeled forklift of, say, 12,000 lbs. I see the reference to it in ACI 360R-10 but it seems like its just referred to qualitatively. It's not clear to me if this method will provide load transfer...

Part and Inventory Search