I was wondering if anyone in the deep utility (i.e water, wastewater) repair/replacement industry would have (and be willing to share) their method/spreadsheet for estimating volumes of materials required for trench excavations? (i.e screened rock, crushed gravel, pit run, sand, native backfill...