Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: teobusetti
  • Content: Threads
  • Order by date
  1. teobusetti

    Beam-Column Seated connection

    Hi everyone! I am new to the site so please forgive me if this is not the right section to post this. I am preparing for my final exam and I found this question in a past paper (see image attached). I have never designed an L-plate connection and I would really appreciate your help. I assume...
  2. teobusetti

    2x2 Cable Net Apply Load

    Hi, Does anyone know how I can apply a total load of 75 N in steps of 12.5 N on a node of a cable net system in a time period of 120s (so 12.5 N every 20s)? I have managed to apply the total final load of 75 N but I cannot find a way of dividing the load into steps. I am new to ABAQUS so it...

Part and Inventory Search