Hi All!
Is there any requirement to provide additional test loop around the fire pump if the system is already equipped with metered test header?
Thanks All!
Sir's
I'm working on a 1-storey warehouse project with multiple fire areas. One of the area/room needs to be separated with 2-hr fire rated construction with the rest of the building. CMU walls were being provided as the 2-hr fire rated separation and they are constructed from floor up to the...