The Pipeline is to be abandoned in 298fsw. Using a series of pumps pushing 1500gpm of seawater at 250 psi it is decided that there is at least one leak in the 30 mile long pipeline to be abandoned.
The Operators want to use air to help the divers find the leaks so they can be fixed.
There is...