Hello,
I'm a beginner in Trane Trace 700, and I'm having a problem I can't figure out. I'm doing load calculations for a building. I ran the calcs and everything came out OK. The procedure for me now is to go through the OA calculations using ASHARE 62.1 excel sheet (the company advises us not...