Question on how to find reliability when you have two different time periods rolled up into the overall reliability requirement. I'm having a doozy of a time trying to create a reliability model for a range safety system that has multiple independent strings.
For illustrative purposes, let's...
Hi all,
Short background:
In my line of work, we must be able to destroy an errant launch vehicle if it is determined to be outside of the predetermined acceptable corridor.
We do this by having transmitter sites that send RF commands to the vehicle.
In any case, when a developer is put on...