Hi,
I am currently running a case in Plaxis 2D of slope stability of unsaturated soils with rainfall. The period of case is 31 days with rainfall on the 6-13th and 27-29th days. I have managed to get completed results for consolidation but when I run for safety, the calculation stops on the...