What are the best solutions to solve the issue of sharp edge shown in the below photos
We have huge quantity and client didnt accept the current status
Gents,
I have a crowded area of foundations, want to use the sand cement mix for backfilling, 50 kg cement for 1 MT of sand
my question is how much the water ration shall be
I need a reference please
Hi Guys,
please try to help me urgently,
I need the details of layers below the flooring tiles/Ceramic, and the most important thing my client is asking me for the reference
We have poured the concrete of footing in foundation (please see the picture)
the required concrete strength is 28 Mpa but it fail on 22 Mpa,
what are the best solution for such problem
http://i57.tinypic.com/2rmsax4.jpg[/IMG]]
when we calculate the hollow block resistance, for the stress shall we consider the whole area of the block or we have to deduct the hole areas from the block surface area
R=P/A
A: with holes area or without?
Hi,
I am preparing the method statement of precast concrete manholes , what are the tests we have to do for the manholes before the backfilling.
Thanks
What are the procedures and conditions that we must take in order to lift the precast concrete foundation, specially after how many days of pouring we can lift the foundation
Hi,
My subcontractor ios asking me to provide him with the Torque value for bolts, but the specification of the project is telling that the bolts shall be SNUG TGHTINED,AISC360 is defining the snug tight condition as the tightness required to bring the connected plies into firm contact.
I have a...