Dear all,
I have a problem related to staircase pressurization system.
do we require fire rated components for this system. Some says, we don't require fire rated components, because this is a fresh air supply system and the ducting and other components are located in a protected space. Is that...
I am starting a new thread regarding mentioned subject because I could not find a solutions from the earlier threads.
I am working on a project which involves condenser and chilled water piping with a vertical rise of approximately 45m
(400mm diameter). My experience has typically been...
Hi All,
I'm a junior mechanical Engineer and new to this forum.
I'm designing a SHEVS (Smoke and Heat Exhaust Ventilation System). I collected the guidance from given by BS 7346, NFPA 92 B, Simplified Method for designing a Mechanical Smoke Exhaust System for high-rise building etc.
my building...
I'm working on a design of HVAC system for a building. I have a conflict to decide, whether we want a smoke extraction system or we do not want. How do we decide it?
Thank you,
Hi,
first of all I want to say that I'm new for this forum.
I'm designing a smoke management system. I have a problem in the selection of Fans for Smoke and Heat Exhaust System, is there a limitation in maximum sound level (dB - limit)? My idea is we do not need to consider about the sound level...