Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: eiadro1
  • Content: Threads
  • Order by date
  1. eiadro1

    Plan 53B with continuous source of nitrogen not rechargeable

    please can we use seal plan 53B bladder connected to available nitrogen tie in in plant. instead of charging nitrogen by bottles
  2. eiadro1

    internal pipe support stress

    i have a case that i need to put internal pipe inside the vessel and pipe need to be supported on the vessel head bu structure support . client is asking to study the stresses on the roof due to this structural support . i got the reaction forces from structural engineer but i couldn't consider...
  3. eiadro1

    PTFE coating repair for existing pressure vessel

    hello im having a case right now of an existing vessel which is PTFE/PFA internally coated - we are going to do some vessel alteration and modification of the vessel by adding some nozzles . accordingly the exiting PTFE coating will be removed before welding and shall be applied again before...

Part and Inventory Search