  1. kkr90

    dead load anlysis in staad pro

    if i am giving only dead load then how the selfweight of the member is applied on structure. Even if i am using truss members at dead load analysis each members shows shear and bending moments.can anyone explain the meaning of applying dead load.
  2. kkr90

    what is the meaning of master slave

    what is the meaning of master slave connection in staad pro and why it is used. is it always necessary to use that. can anyone please brief it with an example.
  3. kkr90

    nature of job for geo technical engineer

    After spending 2 years of work as an site engineer i wish to do my m.tech in geo technical and geo environmental engineering . I want to know the career oppurtunity that i have aftermath of course completion and also nature of work apart from teaching.
  4. kkr90

    shape of pile cap

    hi, I have seen many times the shape of pile cap is always curved in the end i.e..facing the water side.is it releated to the structural load transferring mechanism or it is for making the water 2 flow freely..
  5. kkr90

    air pressure inside bored piles

    hi, I have seen that during placing of concreting using tremie in bored pile they are placing a air pipe or vent pipe in the hopper to allow the flow of air and i had also seen many times air coming out from the pipe,my doubt is how air struck inside the pile when it is full of bentonite...
  6. kkr90

    air lifting technique

    hi, some one explain the process of air lifting technique in piles and why it is used &how to do that
  7. kkr90

    sand collape

    hi, I am kartik,currently I am working in a bridge construction (piling)whenever we are doing the piling,we kind of saving 2 or 3 m3 than actual I don't know whats the problem ,somebody saying it is because of collapsing and i am not sure about that.our pile dia is 1.2m and we are using 1 piece...