I am a recent grad, entry level structural engineer. A problem recently came up at work, where a client wants to drive a 6-axle, 180k drill rig over a 75ft span single lane bridge (with ends fixed in concrete headwall).
Is it ok to analyze this bridge assuming a single pass of the drill rig...