Hello Gents,
Imagine an 25m tall by 5.50m wide, two column piperack supporting 6 piping levels. The consequent frames are spaced every 9.00m.
The frame is a PINNED-BASE MOMENT FRAME
The first level is @+8.00m & carries minor piping.
The second level is @ +11m, & carries very heavy piping. From...