Hello people,
I need some help to specify a plan flush, I am going to pump crude oil 19,3º and 77,14 Cst @ 50ºC ,
I think anything about 13/52 and 65 to dual seal.
anybody has a any suggestion ?
thanks
Hello People ,
I have doubt about sealing plan to use on Vertical pump API VS-6 (3 stages ) , I´ll pump crude oil (19,3ºAPI) Q= 1750 m3/h , H= 66 m.
Anybody has a suggestion about ?
brgs.
Hi People , Is It normal to use relief valve threaded instead of flanged to use on barrier fluid . The pump will work with C5+ (about 1.2 % of benzene ).
I haven´t see anywhere threaded , the aplications I know is only flanged connection .
thanks