Hello all,
We have a pair of pipeline canal crossings that need to be recoated. There are two casings, one 20" and one 24", approximately 5 feet apart. The plan is to hang scaffolding between the piping sections to complete the coating. The scaffolding weighs ~5000lbsmass all things included...