So I'm a young EE, and my boss quit and hasn't been replaced yet. Still have a job to do. Please help if you can.
I've got a system to set up that has a Utility feed to a building carrying roughly 1600A. There is no room for Switchgear, so I have to distribute the load to have multiple...