  1. akoester

    Why Produce Thru the Annulus?

    Facilities engineer here, hoping some production engineers could lend their experience. My company currently produces our onshore horizontal wet gas/condensate wells through tubing from day 1. We've been asked to evaluate a change to producing from the annular side of the B section of the...
  2. akoester

    Vessel/Tank Inspectors - How to Find?

    I hope this is the correct forum for this - while this is not a technical question, I cannot see where else it would fit. Any suggestions for finding a qualified inspector for field equipment? I previously worked for in a long-established field office, and we had a legacy list of inspectors we...
  3. akoester

    B31.8 Contradiction: Class 1, Div 2 Test Pressure

    Please let me know if I am missing something, but I am seeing a contradiction in the ASME B31.8-2010 spec in regards to required test pressure of Class 1, Div 2 pipeline. Section 840.2.2(a)(2) Class 1, Division 2. This Division is a Location Class 1 wherer the design factor of the pipe is equal...
  4. akoester

    Integrated Production Unit/Meter Run Process Safety

    I'm a Facilities Enigneer, and I recently started working in the Marcellus. A lot of the production units installed in Appalachia have meter runs integrated with the production unit skids (picture attached) - installed on the exterior of the cabinet. Our first generation pad design has the...