I am working for a private developer that in it's negotiations with the local road commission have agreed to improve 1/2 mile of an existing gravel road. The agreement was not read over by an engineer and they have agreed to remove all organics and unsuiltable soils. At the time of the signing...
I am completing the design of a well house on a project that originally had been designed without fire flow considerations. The previous design called for a 5000 gal tank. Where can I find, or can anyone tell me, what the storage requirement for fire flow demand is?
I have recently been assigned the project of completing the laying out a well house pump station which was started by an engineer who is longer with my firm. He left good notes, but was the only individual in the office who knew anything about pump stations.
The well house is to be located...