Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MSU95
  • Content: Threads
  • Order by date
  1. MSU95

    Public road on peat & muck

    I am working for a private developer that in it's negotiations with the local road commission have agreed to improve 1/2 mile of an existing gravel road. The agreement was not read over by an engineer and they have agreed to remove all organics and unsuiltable soils. At the time of the signing...
  2. MSU95

    Storage for fire flow in a well tank

    I am completing the design of a well house on a project that originally had been designed without fire flow considerations. The previous design called for a 5000 gal tank. Where can I find, or can anyone tell me, what the storage requirement for fire flow demand is?
  3. MSU95

    Pump house layout

    I have recently been assigned the project of completing the laying out a well house pump station which was started by an engineer who is longer with my firm. He left good notes, but was the only individual in the office who knew anything about pump stations. The well house is to be located...

Part and Inventory Search