Hi I'm a civil engineer with basic knowledge in foundation designs.I hope to have a view on the analysis of this condition.
We will be laying a concrete culvert 1.5 m below ground level with pipes laid inside and is about 100meters length. Parallel to it, is a 20" diameter steel pipe laid in...