Hi all,
I'm an EIT and have been working as a geotechnical engineer for about a year now. Today I went to a site which I presumed was all native soil, but when I got to site I noticed a layer of topsoil about 0.6 m below the existing grade. I had it excavated and chased down the fill. However...