Good day,
I'm having some troubles with the holding time calculation for a LNG tank. In the supplied xls file you have the calculation.
I got the max heat flow to the tank and the max daily evaporation losses. With that info i calculated that the first opening of the safety valve will be in 28...
Good day to all!
First time poster with a problem.
We have a 557 m3 vertical cylindrical steel tank, D=9,3m, h_fill=8,2m tank wall is cca 50 mm.
It will be filled with water from the nearby river in 3 stages. In every stage 1/3 of the volume and left to settle for 48 hours. After it's full it...