I was trying to adjust the parameters (i.e. elevation, dimension, length, etc.) for outlet culverts, orifices, and weirs to achieve the desired flows at three rainfall events (i.e. 1-yr, 10-yr, and 100-yr). However, it is very difficult to adjust the parameters manually to meet one rainfall...