Hello,
i have a preliminary pile load test where a central pile if being placed between 4 anchor piles. The designer is requesting a maximum load of 2 times the service pile load capacity along with a high strain dynamic test.
Generally, once the pile is subject to the ultimate pile load test...
Elevations in meters
The piles are 15 m.deep
Concrete pile @ 2.5m spacing (80cm diamater)
Friction piles
There will be no new piles.
Watertank is founded on a mat foundation but i dont want to disturb the soil near the piles so i am asking abou the minimum distance between the pile and any...
I have a building which has already been constructed supported on piles and a mat foundation. The bottom of the raft is -1.9.
A watertank has been added recently. It is composed of one basement, ground and a roof.
The bottom of its raft is -6.4.
I would like to know what is the minimum distance...
Good day,
During the excavation of the piles under a bridge, one of the piles has been excavated and the machine broke down. Therefore, concretre couldnt be placed inside the pile for more than 24 hours. The machine will be fixed this night and today will be ready.
the pile is filled with...