Hi All,
I'm a piping design engineer, as a general practice I always used to maintain minimum 100mm gap between welds when I deal with 6" pipe. but in recent past I have been asked to show a standard which supports 100mm gap.
I could not able to find the exact gap in any standard, I would like...
In some Bid Projects scope of work, client specifically mentions that “New Standardized Oil Platform Deck (SSS) 10 well design”. Can anyone explain what is “SSS design” and any specific set of design codes/considerations for "SSS Design"?