Choice between diesel and propane may be driven by air permit considerations. If an air permit is required for a permanent backup generator, propane or Natural Gas have lower emissions, and are therefore simpler to permit.
The transformer arrangement for a high leg service with neutral ground...
Might be this pump.
https://zoellerpumps.com/product/922-simplex-prepackaged-system-with-ei820-4/
These are usually reliable even in the single phase version. I prefer the 3 phase version, more starting torque, and no capacitor.
It is not too hard to measure the pumping rate. Calculate the...
A house inspector offers a list of causes of house ceiling fan
https://timbersill.com/light-fixtures/ceiling-fans/ceiling-fan-humming/
Ceiling Fan Uses A Dimmer Switch
Loose Or Faulty Wire Connectors
Loose Light Covers
Loose Ceiling Fan Housing Screws
Vibrating Light Bulbs
Older Ceiling Fan...
Putting the cables in metal pipe, fiberglass duct, or plastic does nothing to the thermal resistance of the dirt. Duty cycle may be controlling as the dirt has a bunch of thermal inertia. Does Neher&McGrath address duty cycle?
Interesting, Another difference between IEC and NEC worlds.
Where FPelec describes towers with 5 phases, 1 circuit with unusual conductor arrangement.
The article I cited above describes a line with 6 phases with 60 incremental degrees phase rotation.
5 phases brings to mind 5 conductors with...
Poll slipping occurs in rotating generators when displacement between rotor and stator magnetic fields does not generate enough torque to keep them in sync, the result is a very violent torque event, jumping to the next alignment that generates sufficient torque.
Pole Slipping can't occur in a...
Primary frequency control and the discussed loss of power factor control are closely related, Attached is a paper "
Primary Frequency Response and Control of Power System Frequency
Prepared for the
Office of Electric Reliability Federal Energy Regulatory Commission
Principal Author
John...
Inertia and VAR control are both necessary components of regulation. if the tariff values them appropriately they will be available when needed.
Here they obviously were not valued appropriately. Will they be the next time they are needed?
6 phase circuit on single tower
So Far only a few installations. Reported to have some advantages in limited rights of way situations.
Revisiting Six-phase Line Transmission
Attached
Performance Evaluation of Six-Phase Power Transmission Line With Limited Right-Of-Way
Or convert the turbo generator sets into synchronous condensers
https://www.eng-tips.com/threads/how-to-convert-generator-to-synchronous-condenser.464327/
On a steam turbine set. the turbine and the generator need to be disconnected from each other, and a pony motor added for startup.
Control...
Many of the major suppliers have offerings, all being marked as able to improve system stability when the conventional supply of inertia is retired. The difficulty is that in many places VARS are not values sufficiently that merchants are encouraged to connect offerings to the grid. That seems...
You should not need to care if the loads share equally, just that none of the rectifiers exceed their current ratings.
Rectifiers have rather minimal ability to accept over loads.
I did not see a current limiting circuit in the rectifier, so any limiting will be by the circuit resistance and...
The vendors statement is most likely literally correct.
Do not expect the rectifiers to share load equally.
The arrangement may be OK if the goal is automatic load shifting between rectifiers on loss of supply, or disconnection of a rectifier. Load shifting does not require load sharing, so...
See NFPA 170 Standard for Fire Safety and Emergency Symbols
The sign in the OP post
"Fire Department Automatic Sprinkler Connection, Siamese"
Example https://www.mysafetysign.com/fire-exit-signs/nfpa-170-fire-signs/sku-s-5589
However an ordnance will trump a standard. Signs with the letters...
EPRI Has published a number of good resource documents related to inspection and operation of deareators. I have attached Deaerator Tank Assessment Guideline Dec 2010.
The National Board publishes System Design, Specifications, Operation, and Inspection of Deaerators Link
This document contains...
The structural member in all cases i am aware of that synchronizes the dolly or skid motion is the ship hull.
The launch systems I am aware of are all specific to individual shipyards (or possibly design agencies).
At the launch pivot point, the skid assembly can be subject to very high...
Back to the OP's subject.
It happened here already.
2022 Odessa Texas Disturbance
ERCOT Presentation September 13, 2022
This event shows that a very short event can create enough upset in a power system to trip it off line quickly - although in the Odessa Texas event the system recovered...