Thanks for the input. I put in a call to the place the contractor will be renting from, I just wanted to make sure there weren't any well known documents I was missing, which it doesn't appear that there are.
I agree that increasing the timber height is the easiest solution. Pending the...
Hi, long time reader and first time poster:
I am designing a crane pick with tight overhead restraints. The contractor needs to lift some temporary shoring steel beneath the existing bridge superstructure. One of the critical dimensions is the minimum distance between the lifting point on the...