Hi, everyone
Im building the kundur two area system in Kundur's book example 12.6 in DigSILENT. the system is stable and the load flows are right when no fault applies. Generators are equipped with AVR and PSS as stated in the book. I selected one of the generators to be the slack bus.
However...