  1. kympen

    Minimum number of days beween pours at joints in RC base slab

    BigH, Thanks for the response. We are trying to find a way to make up time as the project is behind schedule. We would like to meet with the owner to put a proposal for reducing this time constraint and need to put forward a convincing case.
  2. kympen

    Minimum number of days beween pours at joints in RC base slab

    Can anyone give me guidance or point me in the right direction on the minimum number of days between pours at contraction joints in a 12" RC base slab. The joints have a water-bar as it is in a tank. If the forms are pulled the day after pouring, to reduce shrinkage cracking the specification...