Its structural fill gravel with sand and some silt present. Previous and current modified proctor tests showed standard bell curves no double dips. 90% passing 2" sieve, 82% passing 1.5", 66% passing 1", 44% passing No 4, 11.5% passing the 200 sieve. LL was 28 and PL was 21 with a PI of 7...