In regard to DJS's comment, not all GE 90/30 PLCs have CPU modules, some have the CPU embedded in the backplane. The backplane CPU models do not have the keyswitch.
The power supply module should have three green lights on it: PWR; OK; and Run. If the run light is on, the code is running.
It...