Steam turbines with centrifugal overspeed device need to be tested at real overspeed (10% of nominal speed), I've worked with 33, 66 and 135 MW steam turbines. As a back-up, is necessary to test a push button trip, after that one operator is checking the speed ready to trip the turbine with that...