Is not usually to install NEAR each electric motor a safety local switch.
May be for special case like conveyors or similar.
In case that we have for example 1000 electric motors are needed apart of CB install upstream a local switch device?
Any IEC standard with that OBLIGATION?
Yes it is clear that if we need to transport more power we need o increase the voltage.
I am mentioned for case study shown in image. I believe the best option is going directly from 30 kV to 0,4 kV. If we need 6 kV voltage level we add a transformer for that loads.
In most cases, it's standard to not go directly from 30 kV to 0.4 kV. The more common practice is to step down the voltage in stages, typically from 30 kV to 6 kV, then from 6 kV to 0.4 kV.
Any advantages (economical, technical) of it?
Attached example.
I believe the pipe with energy gases (COG, BGF and BOFG) could be classified and we are aware to leave a minimum distance to it. Apart of ATEX could be another issue related with EMC. Yes the pipe has high temperatures (I do not know the value).
We are talking UHV/EHV cables = 400 kV and 230 kV
Energy gases (COG, BGF and BOFG) are mixed, and the result is called BLG (“blandgas”). This gas will be fed a CHPP.
Regarding ATEX maybe in some areas where are located some valves/instruments in that pipes.
Main goal is to calculate the minimum distance between UHV/EHV cables and that pipe.
Vacuum CB's up to 4000A for integration into MV SWGRs for special applications (example: Simetal Sivac-X furnace switchgear) and not into conventional GIS or AIS MV
For MV voltage level (36 kV) the maximum nominal current for CB are:
2500 A
3150 A (forced ventilation)
Nowadays there are still the same values or bigger values can be found? Where?
Service Continuity in GIS:
https://new.abb.com/docs/librariesprovider78/eventos/jjtts-2017/presentaciones-peru/%28jessica-poncedeleon%29-consideraciones-de-seguridad-y-disponibilidad-en-el-dise%C3%B1o-de-equipos-gis.pdf?sfvrsn=2
According NESO (UK TSO):
NESO will submit an initial report to the Secretary of State and Ofgem within 6 weeks, with an initial assessment of the data available at this stage of the review.
NESO will provide a final report to the Secretary of State and Ofgem by end of June 2025, which will...
Does anyone has experience in EHV/UHV GIS expansion? Without any equipped spare available in existing one.
From old models to new models?
From SF6 to SF& FREE?
References?