@hokie66
Agree, but here the strips would be first casted.
Then later, ground slabs, between the strips. Strips would basicly serve as side formwork.
But here another thing that I see as a problem. Elastic settlement of strips.
If the settle eg.2cm, slabs wont follow and there could be...