Hello all,
NFPA 54 section 8.3.2 has a table showing which pipes need to be purged into and out of service, ie if it is a 3" pipe that is greater than 30 feet in length.
NFPA 56 does not have a similar table.
I am at a new facility under construction. May this facility once operational by the...