we have a project that has a cantilevered slab(1000mm overhang- balcony) on the 3rd floor but due to some circumstances, the concrete on the cantilevered portion is not poured on the same time with the main floor slab. Heres my questions, is it safe to consider it a fully rigid even though it is...