@oldestguy, that can be done, but for a 900mm diameter pile, there is not enough room to add so many cables. The cables are actually a hindrance during the pouring for the tremie pipes.
@PEinc, it is a 900mm diameter pile RCC pile, the depth of the pile is 20m. It is a single pile which is to...