Hi, again.
This is the description of the problem.
The box culvert, its buried like 5 m beneath the ground, in both sides of it there will be driving piles to 26 m below the ground level, the piles work by means of friction.
The piles are precast with a 0.40 x 0.40m cross section, and will...