Hello,
I am designing a temporary shoring for a retaining wall along the approaches of a bridge. Temporary sheeting with struts is provided out side the retaining wall.2 struts are provided at 1ft and 5ft below ground elevation. The contractor does not support sheeting on the embankment side...