...means, the Line current, which is equivelant to the phase current in this case = 1581/208= 7.6A. Now, if both Transformers (A & C) are seeing 7.6*120=912VA, this means that the total power supplied = 912*2=1824. This doesn't make sense, because the load is only drawing 1581VA. There is...