1> Design the vessel for the max temperature possible, (ideal for new system)
2> the blow down system need to be redundant, not part of the normal process control.
3> it needs to be a fail-safe system, i.e. loss of signal causes system to activate
4> it need to have controlled access, i.e. plant...