Hi to all,
I'm having a problem with a SAP model. We have a steel beam system to analye, in our office, from a project of another company.
The problem is, that i would like do connect two HE700A with two IPE 200. These HE700A have a 25m span and dist from each other 5.00m. The IPE 200 should...