Contractor installed 15” VCP sewer line approx 12’ below finished grade. Pipe was shaded with sand, the trench was backfilled with native material (lean clay and sand) to 95%, patched with cold mix AC and reopened to traffic. The area sustained 2 significant rainfalls and daily traffic without...