Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SE2607 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. mayor610

    Bio digester connected to Public Toilet

    Hi Everyone, Any ides how to design a Biodigester connected to a Public Toilet so as to extract bio gas for supplying to a household for meeting its cooking requirement of fuel. Regards, Mayor Kumar
  2. mayor610

    Design of Faecal Sludge Treatment Plant

    Dear all, We as detailed Engineering Design consultants are involved in designing FSTP in East Asian tropical country where the client has got distracted by the earlier design given in the Master plan which advocates the use of facultative primary lagoon followed by aerobic lagoon for the...
  3. mayor610

    Criteria for provision of Equalisation Tank in Sewage Treatment Plants

    Dear all, We are executing a contract for provision of 10 MLD STP based on Sequencing Batch Reactor Technology for a Smart City wherein ( CONTRACT AGREEMENT)it is clearly specified that an EQUALISATION TANK will also be provided by the contractor. But based on psra 5.6.3 FLOW EQUALISATION of...
  4. mayor610

    Discharge header Vs Manifold

    Dear All, We at a Municipal Corporation floated a tender for "replacement of Vertical turbine Pumps ( 2 w + 2 s) along with replacement of Column pipes and discharge header valves etc."for the raw water intake well. Now the contractor while carrying out...
  5. mayor610

    Water supply Codes of UK

    Hi! I am in need of UK Water Supply Codes. Could anyone guide from where to download free of cost the laying of water pipeline etc Codes applicable in UK. Thanks & regards, Mayor Kumar SE{Retd} MES
  6. mayor610

    Percolation and evaporation losses

    Dear ALL, We in Chhattisgarh are in the process of designing Sewerage Master Plan by proposing to trap the DWF flowing in nullahs through a weir and diverting it the proposed STP d/s through intercepting sewer which is also proposed to be laid along the river. The point is ---since all the...
  7. mayor610

    Protection of water pipeline against contamination

    No the gravity Main has already been laid. At places where the Raw Water gravity Main runs close to existing RCC open drain [ Say about 2m horizontal distance away and almost at the same elevation], the Raw Water Gravity Main has been provided with the 150 mm thick coarse sand encasing all...
  8. mayor610

    Protection of water pipeline against contamination

    Dear All, I am dealing with laying of MS pipe for raw water in Chhattisgarh. Now at a few places the raw water pipeline has been laid in drains which get completely full right upto the top of the culvert level with rainwater during monsoon which last for 03 months. In such a scenario to...

Part and Inventory Search