Good morning,
Thank you for your best suggestions, I will apply for this project.
Regarding our organization in this project, we are a team in several specialties (Process, HSE, mechanical, electrical, instrumentation and civil engineers) who work in accordance with interface engineering...
Biginch hello,
Actually, the fire is a very serious problem, which is why I chose the code.
For industrial safety, without the code you can’t make a design of a reliable installation,
In my previous mesages, when I told a friend, this is not a joke, it's legal contract between us,
I do not...
Hi,
Thank you for your effective cooperation.
I am a mechanical engineer (thermal) trying to dimension a fire protection hydraulic system for a friend.
Regarding my previous questions, I am going to use a pressure differential on upstream DN 80 piping system (here is enclosed pdf file),
For...
Good morning everybody,
I have a piping design which has the following data:
1) Main piping: DN 150 and 11 bars pressure
2) secondary piping: DN80, 11 bars pressure
water arrives from piping DN150 and feeds the DN 80 system ,as shown in the enclosed diagram,
Each sprinkler supports a...
Hello,
Please, I would like your opinion on the fire pump installation,
flow for the main pump (electrical)is equal to 128 m3 / h, flow calculed as per APSAD R1,
For the installation, I must installed a pump (flow=128 m3 / h) or two (02) pumps 60m3 / h each in parallel?
Thank you in advance...
Good morning LCREP,
Thank you sir for your good collaboration,
for information, my case is a network of firefighting of a Cannery boxes of sardines
plant,
thank you in advance and good luck to all intevenant,
R.B (Mechanical Engineer)
(Note: sorry for my english)
Hello,
Please, I need your comment about the operating philosophy of a group of fire pump:
Setting the pressostat:
The pressostat connected to the jockey pump (1) should be set to:
- A starting pressure of 9.5 bara
- A shut-off pressure of 11 bara
The pressostat connected to the pump jockey...
Hello,
Please advise me, concerning the cost of prefabrication and erection work of CS (carbon steel) and SS (stainless steel) piping.
A bad welder welds one joint of welding (pipe 2'' diameter) per day???? Correct me please.
Is there a website to clarify my concern?
Thank you in advance...
Hello,
Please advise me, concerning the cost of prefabrication and erection work of CS (carbon steel) and SS (stainless steel) piping.
A bad welder welds one joint of welding (pipe 2'' diameter) per day???? Correct me please.
Is there a website to clarify my concern?
Thank you in advance...
Hi,
sanjaygail77 & TD2K tanks for your help,
Questions:
Can I take (12.5 %) of falling in the thickness?
Can I refer to B31.3 code, paragraph 304.1.1?
Is there anyone who can help me to list the steps that the inspection section is changeable?
Regards and have a nice day
R.B (Mechanical...
Good morning,
Please, I need to know what percentage of falling thickness it is said that pipes must be changed.
Piping case (process and power),
Regds
R.B (Mechanical Engineer)
My installation is to protect floating roof tanks (six (06) tanks), the tanks presents the same capacity (50 000 m3) and the same liquid (crude oil), the type of roof is a floating roof double deck,
My concern is to choose the code to calculate the flow of cooling water and foam,
At the moment...
Good morning experts,
thank you for the message you sent for my preoccupation cited above
Concerning firefighting calculation, I opted the following codes:
- NFPA 11, 15 et 30
- API650 édition (Annex C)
The worst case scenario is:
The worst case is to calculate the firefighting flow...
Dear members,
What are the design guidelines in the design of Fire Protection tank (fixed and floating roof)?
thanks in advance,
R.B (Mechanical Engineer)
Good morning everybody,
Below you will find clarifications for my concern:
1)Velocity = 6 to 7 ft/sec for all production, my case is well water (existence of a quantity of salt),
2)The outside diameter of the inlet is 3” and outlet pipes is 2” (schedule I do not now),
3)I will do a...
Good morning,
I want to calculate the inner diameters of the suction and discharge of a centrifugal pump.
The installation of this pump is old and the type is centrifugal pump (suction is horizontal and discharge is vertical).
The pump was purchased without documentation and without name...
Good morning,
Please advise me, why after fabrication work the pneumatic test for hole (PAD) for the piping reinforcement is not required by the ASME B31.3 code?
In the case of reinforced nozzle storage tank, it is required by the API 650 code,
Thanks for the help,
Best regards,
R.B...