    We are compining an AHU DOL Starter & BMS Interface DDC inside the same 60 x 60 cm Enclosure

    We have in our project to combine Each AHU Starter (DOL) and its BMS interface (DDC) inside one enclosure 60 cm x 60 cm., is there will be any interference between the power cable feeding the starter and the BMS DDC performance , as they will be contained inside the same enclosure, and is there...
  2. miblec2009

    Should we disconnect the cable from its source in case of fire ?

    Waros, The cables already in a cable tray, and its protected by normal miniture circuit breakers and not MCCB's and it will take time to disconnect due to overlaoding by the heat, in many malls all AHU's is supplied by centeralized MCC's and also fed by a fire rated cable, and by the way there...
  3. miblec2009

    Should we disconnect the cable from its source in case of fire ?

    Thanks for your quick reply, but what i need to confirm that its recommended for sure to not allow any cable energized in case of fire except for the critical loads you have which is supposed to be fire rated cables, but all my feeders to the AHU's are normal PVC cables and by that way if i will...
  4. miblec2009

    Should we disconnect the cable from its source in case of fire ?

    Hi Guys, I have been looking days and days for something in the code to help me in my inquiry but it seems it will take long time, so i decided to take it short to here for any help , I have in my project 122 Air Handling Units suspended to the ceiling of an IKEA Mall here in Cairo, Egypt & at...