Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Weimsguy

    NOAA Atlas 14, Vol 11, v2

    The Point Precipitation Frequency Estimates (available from https://hdsc.nws.noaa.gov/hdsc/pfds/) now have additional return intervals for 200, 500, and 1000. Any chance these will be added to the Table Lookup Storm events. Also the estimates given in the download table are slightly different...
  2. Weimsguy

    Delay editing Links

    Follow up on Peter's comment on the manual hydrograph. I have updated all 15 rainfall events and pared the hydrographs down to a maximum of 341 records for the 5hr events. There is now no delay when selecting Edit for any of the Links in my projects.
  3. Weimsguy

    Delay editing Links

    Peter, Thanks for the reply. I did not think about the delays being caused by the manual hydrographs, but it makes perfect sense now. The hydrographs are cut and paste from HEC-HMS with a 10 sub-basin model and several small reservoirs and reach routings. I only have the 5 node version of...
  4. Weimsguy

    Delay editing Links

    When I right click on the Link and select Edit. Here is one of the Project files.https://files.engineering.com/getfile.aspx?folder=fc290615-dfd4-46bf-ad01-aca683c16a16&file=Timber_Lake_Dam_TCEQ_1hr.hcp
  5. Weimsguy

    Delay editing Links

    Has anyone else experience a delay editing a Link? Delay is around 30 seconds, not a huge delay, but longer than other elements. The Links are not tied to any other projects. HydroCAD v 10.10-5a Five Node. Windows 10 Pro 64-bit, 32GB RAM, Intel(R) Core(TM) i7-2600 CPU @ 3.40GHz
  6. Weimsguy

    Reach Profile Slope Lock

    I am trying to keep the slope on a reach based on a cross-section to lock. I enter the data for Inlet Invert, Slope, and then lock the slope, apply the changes. When I go back into edit the reach, the locks are open and the slope has changed. I have also tried locking both the Outlet Invert...
  7. Weimsguy

    HydroCAD to HEC-HMS Meterologic Models for TCEQ PMP rainfall events.

    Thanks for the explanation. Now I just need to figure out how to define the TCEQ distributions as a Precipitation Gage in HEC-HMS.
  8. Weimsguy

    HydroCAD to HEC-HMS Meterologic Models for TCEQ PMP rainfall events.

    I have been working on a Texas Comission on Enviromental Qualtiy (TCEQ) Dam Breach Hydrologic & Hydrologic Analysis and had modeled the area above the dam as a single sub-basin as a catchment, the lake as a pond, and the dam spillway and breach as outlets of the pond. Peter Smart added the TCEQ...
  9. Weimsguy

    HydroCAD Dam Breach vs. HEC-HMS Dam Breach

    I am working on a Dam Breach analysis for a small dam in Southlake TX. "The Hydrologic and Hydraulic Guidelines for Dams in Texas" by Texas Commission on Environmental Quality (TCEQ) states in section 8.4 Dam-Breach Models "For existing small or intermediate size dams, regardless of hazard...
  10. Weimsguy

    Dam Breach Outlet

    I know the rectangular Dam Breach Outlet is in the very extensive Help file, but (IMHO) it might be useful to also mention it in the Documentation. Or even a data check of (Notch Angle) .LE. 0 or Null ==> Rectangular Breach Outlet.
  11. Weimsguy

    Dam Breach Outlet

    Thanks. I read the manual and the error message was pretty clear, but I did not read the Help display. I will always start there before posting any more questions.
  12. Weimsguy

    Dam Breach Outlet

    The Texas Commission on Environmental Quality (TCEQ) Dam Safety Program document GI-364 "Hydrologic and Hydraulic Guidelines for Dams in Texas" 8.3 Breach Parameters / Breach Configuration (Embankments) requires a breach width minimum of 3 times the height of water being impounded and vertical...
  13. Weimsguy

    Flow through Dam Breach

    The model, in the state that is was posted, was an attempt to match some earlier work where I put the breach on the spillway, but did not trigger it until the water was about two feet over the spillway invert of 624.8 ft. The intent of the next model was to vary the breach location/elevation...
  14. Weimsguy

    Flow through Dam Breach

    Sketch of dam.http://files.engineering.com/getfile.aspx?folder=55685284-49d3-4ef0-9c52-01e3d8ebc2e7&file=StoneLakeDamBreach_sketch.pdf
  15. Weimsguy

    Flow through Dam Breach

    I only get Warning 95 when I route the flow through the individual outlets (which also happened in your webinar on Dam Breach). The "significant difference" I noted in the original message was due to not all the settings being identical. The inflows I am having to run are starting to cause...
  16. Weimsguy

    Flow through Dam Breach

    I have a simple dam with a concrete weir 150 ft wide x 8 ft breath and 139 degree notch angle at the center of the dam. The rest of the earthen embankment starts at the top of the weir and increases asymmetrically to the top of the dam. Ideally I would like to know the flow associated with the...
  17. Weimsguy

    Type II 72-hr Rainfall

    TCEQ: 4.3 Temporal Distribution of Design-Storm Precipitation "Distribute the total depth of the PMP, for both the entire basin as well as for each subbasin, as appropriate, temporally...". I assumed that meant using the a 72-hr distribution with the 72-hr rainfall. I should have remembered...
  18. Weimsguy

    Type II 72-hr Rainfall

    I am just getting started with HydroCAD, so I have not explored all the options; I was hoping it was as simple as grabbing the Type II 72-hr.hrc file from somewhere. I do not know all of the specific project requirements yet, but I have read in the TCEQ (Texas Commission on Environment Quality)...
  19. Weimsguy

    Type II 72-hr Rainfall

    I was able to download and add Type II 48-hr.hcr storm to the HydroCAD Rainfall Library. Is there a way to Use the 6-hr, 12-hr, 24-hr, and 48-hr to derive the 72-hr storm? We are getting into Dam projects that require looking at PMP/PMF events.

Part and Inventory Search